
© UrbanWorks, Ltd
|
|||||||||||||
| Location Gary, IN Client City of Gary, IN Architect UrbanWorks, Ltd. Consulting Firms Wolff + Associates (Planner and Landscape Architect) Project Initiation 2003 Completion of Work 2004 Site Area 30-mile greenway corridor (site) |
This master plan rings the industrial city of Gary, Indiana with a natural resources greenway and recreation corridor by connecting the Grand Calumet River, the Little Calumet River, and the Lake Michigan shoreline. Links with the Indiana Dunes National Lakeshore to the east establish the new parkland as part of a continuous regional landscape amenity.
Input from community, municipal, and regional representatives was critical to the development of the plan. Whenever possible, the proposal restores native ecological communities to create sustainable landscapes. Bicycle and pedestrian trails are sensitively introduced as active elements within nature. The comprehensive analysis of existing conditions and proposal of new design ideas produced guidelines for model ordinances to implement the Gary Green Link through new local zoning and landscape management practices. |
||||||||||||
